Virtual PPA accounting under IFRS 9: derivative, fair value and entries

Companies sign virtual PPAs to fix part of their power cost and to claim renewable electricity, without changing supplier. The contract is simple to describe and awkward to account for: a long-dated derivative on an illiquid price, with a volume that depends on the weather. This guide explains why it is a derivative, how the fair value is built, the entries with and without hedge accounting over two years, what the 2026 amendments changed, and why US GAAP often gives a different answer.

By Mirza Fahad Baig, Chartered Accountant (ICAP). Reviewed by Muhammad Bilal, Chartered Accountant. Updated . 11 minute read.

Short answer

Virtual PPA accounting under IFRS starts from one fact: no electricity is delivered. A virtual power purchase agreement is a contract for differences. The buyer and the wind or solar farm settle in cash the gap between a fixed strike price and the market price on the farm's output. That makes it a derivative under IFRS 9, measured at fair value, with changes in profit or loss unless the buyer applies cash flow hedge accounting. Amendments effective from 1 January 2026 make that hedge accounting easier to achieve. In this guide's example, a ten-year contract at a US$ 45 strike is a US$ 3.4 million asset after year 1 and a 1.2 million liability after year 2, a swing that hedge accounting keeps out of profit.

At a glance

What it is
A contract for differences on power
Standard
IFRS 9: a derivative
Measured at
Fair value, usually level 3
Default
Changes in profit or loss
With hedge accounting
Effective part in OCI
US GAAP
Often not a derivative
Virtual PPA accounting under IFRS 9: derivative, fair value and entriesWhat it is: A contract for differences on power; Standard: IFRS 9: a derivative; Measured at: Fair value, usually level 3; Default: Changes in profit or loss; With hedge accounting: Effective part in OCI; US GAAP: Often not a derivative.KEY FACTS AT A GLANCEVirtual PPA accounting under IFRS 9: derivative,fair value and entriesWhat it isA contract fordifferences on powerStandardIFRS 9: a derivativeMeasured atFair value, usually level3DefaultChanges in profit or lossWith hedge accountingEffective part in OCIUS GAAPOften not a derivativeTax BakersVirtual PPA accounting under IFRS 9: derivative, fair value and entriesWhat it is: A contract for differences on power; Standard: IFRS 9: a derivative; Measured at: Fair value, usually level 3; Default: Changes in profit or loss; With hedge accounting: Effective part in OCI; US GAAP: Often not a derivative.KEY FACTS AT A GLANCEVirtual PPA accounting under IFRS9: derivative, fair value andentriesWhat it isA contract for differences on powerStandardIFRS 9: a derivativeMeasured atFair value, usually level 3DefaultChanges in profit or lossWith hedge accountingEffective part in OCIUS GAAPOften not a derivativeTax Bakers
Key facts at a glance, as set out in this guide.

What is a virtual PPA, and why is it a derivative?

In a physical power purchase agreement the buyer takes the electricity. In a virtual PPA, also called a synthetic or financial PPA, it does not. The generator sells its output into the wholesale market at the market price, the buyer keeps buying power from its usual supplier, and the two settle the difference between the strike price and the market price for each megawatt-hour the farm produces. The buyer usually also receives the farm's renewable energy certificates.

IFRS 9 test for a derivativeVirtual PPAMet?
Its value changes with an underlyingThe wholesale electricity priceYes
It needs little or no initial investmentNothing is paid on signingYes
It is settled at a future dateMonthly or quarterly cash settlement over 10 to 15 yearsYes

Because it is settled only in cash, the own-use exemption that keeps most physical PPAs out of IFRS 9 is not available: there is no delivery of power for the buyer's own use. A lease is also ruled out, since the buyer never controls the farm's output. The whole contract is a derivative for both parties. See power purchase agreements for the physical kind and the own-use exemption.

QuestionPhysical PPAVirtual PPA
Is power delivered to the buyer?YesNo
Usual accounting for the buyerOwn use: a purchase as power arrivesDerivative at fair value
Balance sheet before deliveryNothingDerivative asset or liability
Profit or lossCost of power at the fixed priceFair value changes, unless hedge accounting applies
Can it contain a lease?Yes, in some designsNo

How is the fair value of a virtual PPA measured?

As the present value of the expected settlements over the remaining term: for each future period, expected volume × (expected market price less strike price), discounted. Four inputs do the work.

  • Forward electricity prices. Quoted prices exist for the first two to five years in most markets. Beyond that the curve comes from a model or a price forecaster, which is why these contracts usually fall in level 3 of the fair value hierarchy.
  • The capture price. A solar farm produces when every other solar farm does, so it earns less than the average market price. The valuation uses the price the farm is expected to capture, not the baseload price.
  • Volume. Usually the expected long-run output of the farm, adjusted for curtailment and outages.
  • Discount rate and credit risk. Including the counterparty's credit risk on an asset and the company's own on a liability.

If the model gives a value other than nil on the signing date and that value rests on unobservable inputs, the day-one gain or loss is not recognised at once. It is deferred and released over the contract. See fair value levels.

Worked example: two years of a virtual PPA

A manufacturer signs a 10-year virtual PPA with a solar farm on 1 January 20X1. The strike is US$ 45 a megawatt-hour and expected output is 100,000 MWh a year. The fair value at signing is nil. The manufacturer uses about 100,000 MWh a year, bought from its supplier at market prices. The discount rate is 6%.

20X120X2
Farm output, MWh96,00098,000
Market price captured, US$ per MWh5241
Settlement: output × (price less 45), US$ thousand672 received392 paid
Forward price for the remaining years at the year end5043
Years remaining98
Annuity factor at 6%6.80176.2098
Fair value at the year end, US$ thousand3,401(1,242)
Change in fair value in the year3,401(4,643)

Year-end fair value is 100,000 × (forward price less 45) × the annuity factor: 100,000 × 5 × 6.8017 = 3,400,846 at the end of 20X1, and 100,000 × (43 less 45) × 6.2098 = (1,241,959) a year later. A US$ 7 fall in the long-term price turns an asset of 3.4 million into a liability of 1.2 million.

Virtual PPA accounting: the journal entries

Without hedge accounting, everything goes through profit or loss.

WhenEntryUS$ thousand
SigningNo entry: fair value is nil
20X1: settlements receivedDr Cash
Cr Gain on derivative, profit or loss
672
672
31 December 20X1: remeasureDr Derivative asset
Cr Gain on derivative, profit or loss
3,401
3,401
20X2: settlements paidDr Loss on derivative, profit or loss
Cr Cash
392
392
31 December 20X2: remeasureDr Loss on derivative, profit or loss
Cr Derivative asset
Cr Derivative liability
4,643
3,401
1,242

With the contract designated as a cash flow hedge of the manufacturer's forecast electricity purchases, and assuming the hedge is fully effective:

WhenEntryUS$ thousand
20X1: settlements receivedDr Cash
Cr Electricity cost
672
672
31 December 20X1: remeasureDr Derivative asset
Cr Cash flow hedge reserve, OCI
3,401
3,401
20X2: settlements paidDr Electricity cost
Cr Cash
392
392
31 December 20X2: remeasureDr Cash flow hedge reserve, OCI
Cr Derivative asset
Cr Derivative liability
4,643
3,401
1,242

What difference does hedge accounting make to profit?

US$ thousand20X120X2
Electricity bought at market: 100,000 MWh at 52 and 415,2004,100
Settlement under the virtual PPA(672)392
Cost with hedge accounting4,5284,492
Fair value change on the remaining contract(3,401)4,643
Cost in profit or loss without hedge accounting1,1279,135
Electricity cost reported each year, US$ thousandElectricity cost reported each year, US$ thousand4,5281,12720X14,4929,13520X2With hedge accountingWithout hedge accounting
The cash paid is the same. Without hedge accounting, changes in the value of the remaining contract move profit.

The cash is the same in both columns. With hedge accounting the manufacturer shows what the contract was signed to deliver: power at about US$ 45, or 45.28 and 44.92 a megawatt-hour in the two years. Without it, the reported cost is 1,127 thousand one year and 9,135 thousand the next, because eight or nine years of future price changes land in a single year's profit.

How does hedge accounting work for a virtual PPA?

The derivative is the hedging instrument and the company's forecast purchases of electricity at variable prices are the hedged item. The effective part of the change in fair value goes to other comprehensive income and is recycled to electricity cost as the purchases happen. Three things cause ineffectiveness, which goes to profit or loss:

  • Volume. The farm produces more in a period than the company buys.
  • Shape. A solar farm produces at midday; a factory may run at night. The price the farm captures differs from the price the company pays.
  • Location. The farm's price zone is not the company's.

Before 2026 the weather-driven volume was a real obstacle, because a hedged item normally has to be a specified amount that is highly probable. The IASB's December 2024 amendments, for contracts referencing nature-dependent electricity, allow the hedged item to be a variable volume of forecast electricity transactions that matches the variable output expected under the contract, as long as the company's forecast purchases support it. They apply to annual periods beginning on or after 1 January 2026 and add disclosures about these contracts. See IFRS 9 hedge accounting.

How are the renewable energy certificates treated?

Most virtual PPAs bundle the farm's certificates with the price swap, and the certificates are often the buyer's reason for signing. They are a non-financial item that is delivered, so that part of the contract is a purchase, not a derivative. In practice the part of the fixed price that pays for the certificates is separated, recognised as the certificates are received, and left out of the derivative's valuation. See renewable energy certificates.

How does the generator account for it?

The same way, in mirror image. The farm sells its power into the market and recognises that revenue under IFRS 15. The virtual PPA is a separate derivative: when prices are below the strike the farm receives the difference, and when they are above it pays. A generator can designate it as a cash flow hedge of its forecast sales, so that settlements are reported in revenue and the remaining fair value changes in OCI. Lenders usually require the contract precisely because it fixes the farm's income. See power and utilities accounting.

Where does it appear in the financial statements?

  • Balance sheet. A derivative asset or liability, split between current and non-current by settlement date.
  • Income statement. Under IFRS 18, gains and losses on a derivative used to manage the price of power the company uses go in the operating category. See where derivatives go under IFRS 18.
  • Notes. The fair value level, the unobservable inputs and a sensitivity to them, any deferred day-one difference, and the hedge accounting disclosures.

How does US GAAP differ?

Often the contract is not a derivative at all. ASC 815 requires a derivative to have a notional amount, and a virtual PPA that settles on whatever the farm happens to generate, with no minimum volume, is commonly judged not to have one. The buyer then simply records each settlement as it falls due, with nothing on the balance sheet for future years. A contract with a fixed or minimum volume is a derivative under US GAAP as well. The same contract can therefore produce a multi-million fair value under IFRS and no entry under US GAAP, which groups reporting under both need to track. See IFRS 9 vs ASC 815.

Keep going

Our free Excel models work through the examples in these guides, and the comparisons show where IFRS and US GAAP part ways. Every guide names the Chartered Accountant who wrote it and the one who reviewed it.

Questions people ask

Is a virtual PPA a derivative under IFRS 9?

Yes. It is settled in cash against the market price of electricity, needs no initial investment and is settled in the future, so it is measured at fair value.

Can the own-use exemption apply to a virtual PPA?

No. The exemption needs physical delivery of electricity for the company's own use, and a virtual PPA is settled only in cash.

Can a virtual PPA qualify for hedge accounting?

Yes, as a cash flow hedge of forecast electricity purchases or sales. Amendments effective from 1 January 2026 allow the hedged item to be a variable volume that follows the farm's output.

What fair value level is a virtual PPA?

Usually level 3, because long-dated electricity prices, capture rates and output are not observable in the market.

How is a virtual PPA treated under US GAAP?

A contract with no fixed or minimum volume is often not a derivative under ASC 815 because it lacks a notional amount, so settlements are recognised as they occur.

Is a virtual PPA a lease?

No. The buyer does not receive the electricity or control the use of the plant, so there is no identified asset under its control.

Sources

The standards, updates and other documents this guide draws on.

  1. IFRS Foundation: IFRS 9 Financial Instruments
  2. IFRS Foundation: IASB updates accounting standards for nature-dependent electricity contracts (December 2024)
  3. IFRS Foundation: IFRS 13 Fair Value Measurement
  4. FASB Accounting Standards Codification: Topic 815, Derivatives and Hedging

Rules and fees change. If you are reading this long after November 19, 2026, confirm the figures with the source before you rely on them.